News

Plafotherm® also meets the highest requirements

13.08.2012 – A wide range of renowned high-rises in Frankfurt were in the recent years already equipped with Plafotherm® heated and chilled ceilings by the Lindner Group. Thanks to the Lindner system, for example the Main Tower, the Westhafen Tower and the “Messetower” have a comfortable indoor climate. Now there’s another big order for a commercial tower in Frankfurt – the SilverTower. Lindner realised...

New Reference: ADAC headquarters

08.08.2012 – The new ADAC headquarters accommodates 2,400 employees who were previously spread across six different locations in Munich. The 18-storied office tower rises above the 5-storied base.

Room-in-Room System Lindner Cube

06.08.2012 – Lindner´s room-in-room system make it possible to create your rooms according to the wishes of customers. Lindner Cube is a self-contained and free standing room system that requires no connection to surrounding components. Furthermore, this system offers maximum flexibility by Lindner and freedom. As workflow and room structure changes often, you can readily react to these requirements with the...

Lindner ceiling systems fulfil LEED and DGNB criteria

01.08.2012 – You can now find Lindner ceiling systems and heating and cooling ceiling systems in the product database on www.greenbuildingproducts.eu. The listed products and systems by Lindner AG contribute to fulfil credits in the LEED and DGNB system.

Project Report: Peninsula Place, Greenwich, London

30.07.2012 – Lindner Fassaden designed one of the most sustainable commercial buildings in the UK, with a BREEAM rating of ‘Excellent’. This was the first major development in the Greenwich regeneration scheme.

Displaying results 56 to 60 out of 66

<

1

2

3

4

5

6

7

8

9

10

11

12

13

14

>