Print
References
You can sort these references by different criteria. Please select from the column on the right hand side.
Hessian State Parliament
General
| Project: | Hessian State Parliament |
| Building type: | Government building |
| Street: | Schlossplatz 1-3 |
| ZIP code: | 65183 Wiesbaden |
| Country: | Germany |
| Completion: | From 2005 to 2008 |
| Order amount: | 4,62 Mio. € |
| » Reference data sheet (PDF) | |
Description
| Project: | Hessian State Parliament |
| Description: | The new Hessian State Parliament was finished after a building period of three years. Lindner was responsible for the interior fit-out of the plenar hall, fitted wooden doors and metal-glass-facade. |
Architect/Builder
| Architect: | Waechter + Waechter Architekten BDA |
| Town: | Darmstadt |
| Country: | Germany |
| Builder: | Hessisches Baumanagement Regionalniederlassung |
| Town: | Wiesbaden |
| Country: | Germany |
Products
| Product line: | Number | Unit |
|---|---|---|
| Wooden doors | ||
| Fire Doors | ||
| T30 | ||
| Smoke Control Doors | ||
| Sound Insulation Doors | ||
| Door Frames | ||
| wooden frame | ||
| steel frame | ||
| curtain wall | ||
| stick system | ||
| window units | ||
| special facade | ||
| partitions | ||
| wall cladding | ||
| ceilings | ||
| ceiling coverings | ||
| balustrades | ||
| radiator linings | ||
| floors | ||
| floor coverings | ||
| wood | ||
| tribunes | ||
| stair platforms | ||
| furniture | ||
| Built-in Fixtures | ||
Download
» Vision becomes reality (PDF)
Excerpt from the Lindner reference book.

