News

Preserving the silence with Lindner soundproof doors

20.11.2013 – Lindner premium doors improve the sound protection in your rooms. The professional expertise of the family-owned company based in Lower Bavaria is displayed by its highly individual and complex projects.

Tested product system of Lindner GFT and Kiesel - Large tiles to 10,000 cm² on Norit dry screed

20.11.2013 – Lindner GFT and Kiesel present a compound construction that consists pre-finished screed and tiles with a seal of approval for the installation of large format ceramic tiles on dry screed.

Lindner Vitrum and Planum – A highlight among the Lindner dry lining systems

08.11.2013 – The installation of dry lining systems is relatively simple. The gypsum plasterboard walls and the associated substructure are easy to work on. Since solely the treatment of the surface requires the use of wet materials, the architects and building owners save a lot of time by reason of the omission of long drying periods.

Lindner Suspended Fireproof Ceiling LMD F30 Type 8 with hygienic verification of suitability

06.11.2013 – Suspended fireproof ceilings have to meet highest technical, aesthetic and functional requirements. Therefore, Lindner fireproof ceilings have always been distinguished. Now, they have to face other challenges: LMD F30 Type 8 is tested for hygienic suitability, the components are optimised and ideally suitable for the use in hospitals.

Baufeld Nord 1, Frankfurt am Main

04.11.2013 – The Baufeld Nord 1 is the first office building project to be effected in the Europa district of Frankfurt am Main. It was designed by Schneider + Schumacher. In total, 34.000 m² of office- and business areas were created on seven floors.

Displaying results 21 to 25 out of 77

<

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

>