duka 4.0

General

Project: duka 4.0
Building Type: Office buildings, Business premises, Exhibition, Production rooms
Address: Duka Straße 2
Zip/City: 39042 Brixen
Country: Italy
Company Division: Lindner SE | Interior Product Supply
Completion: from 2018 to 2019

Description

Project: duka 4.0
Description:

Duka is a manufacturer of high quality shower cubicles. The company is traditionally anchored in Brixen with several premises. With "duka 4.0", Duka concentrated these locations in a new building in the south of Brixen, which combines development, production, administration, sales rooms and an exhibition under one roof. Around 300 employees work there.

Lindner supplied ceiling systems with heating and cooling technology as well as floor systems for the interior fit-out of duka 4.0. Post-cap ceilings of the type Plafotherm® B 100 were installed over a large area in order to regulate the building temperature in an efficient and sustainable manner. The integrated ventilation elements of the AirBox S/E type also ensure the ventilation of the premises. A variant are plasterboard heated and chilled ceilings of the type Plafotherm® GK HEKDA, which were used in selected places. The building is also extensively equipped with Lindner floor systems, in particular FLOOR and more® hollow floors as well as the particularly stable variant FLOOR and more® power. With NORTEC raised floors, inspection openings were made in the otherwise closed floor area.

Companies involved

Client: Duka AG, Brixen, Italy
Architecture: KUP – ARCH Architekten architetti, Brixen, Italy
Partner: Fkontract GmbH | www.fkontract.com, Bozen, Italy

Products

Heated and chilled metal ceilings
Plafotherm® B - Post Cap ceilings 3,600 sqm
Plasterboard heated and chilled ceilings
Plafotherm® GK HEKDA® - plasterboard ceiling 300 sqm
Hollow floor systems
FLOOR and more® 9,300 sqm
FLOOR and more® power 350 sqm
Raised floor systems
NORTEC 250 sqm

Downloads