The approximately 47,000 square meter Hard Turm Park was developed on the former Hardturm area. This new city district offers around 500 apartments as well as numerous office and commercial spaces, surrounded by generous open spaces. The construction field A2 also follows this mixed use. Commercial and office space is concentrated on the street side, which is why bright window fronts were integrated into the façade. In the courtyard as well as in the direction of the pedestrian zone residential areas have been created. The Lindner Fassaden GmbH was responsible for large parts of the façade surface of the construction field A2. This includes the glazed areas on the street side and in the courtyard, as well as steelwork in the form of railings and balconies. |