BASF Business Center D105

Général

Projet: BASF Business Center D105
Forme du bâtiment: Immeuble de bureau
Adresse: Carl-Bosch-Straße
Code postal/Ville: 67056 Ludwigshafen
Pays: Allemagne
Company Division: Lindner SE | Aménagement Central.Est Allemagne, Lindner SE | Aménagement Intérieur et Ameublement, Lindner SE | Chauffage et Refroidissement
Achèvement: from 2014 to 2016

Description

Projet: BASF Business Center D105
Description:

The newly constructed Business Center D105 extended the capacities of BASF at their headquarters in Ludwigshafen am Rhein. The building offers a net floor area of 38,000 sqm on seven floors. When the concept for this development was established, one of the main endeavours was to create an environment for a staff of up to 1,300 that offers both functionality and sustainability. A certification according to DGNB Platin is sought for this building. In regard of its use, the building presents itself as a multi-functional and high-quality office building with substantial conference facilities.

Lindner participated in this development as a general contractor. The comission included the fitting of Plafotherm® Plasterboard heated and chilled ceilings in the prestigious entrance hall, which also saw the execution of other dry construction and plastering works, similar to other parts of the building. The office areas have been fitted extensively with Lindner Metal Ceilings, partly executed with integrated heating and cooling technology. In order to create spatial separation in these areas, Lindner Partitions with integrated doors have been installed. Further doors made from wood and stainless steel were also part of the performances executed. A visual break from other facilities is found in the conference area and the canteen, where in both cases perforated baffle ceilings with partially integrated heating and cooling technology have been installed. The staff canteen stands out particularly with its ondulating LMD-L LAOLA and integrated LED luminaires. The performance spectrum of Lindner Group is rounded up with several fixed furnishings and the stage of the conference area as a custom construction.

Entreprises impliquées

Client: BASF SE, Ludwigshafen, Allemagne
Architecture: HPP Hentrich-Petschnigg & Partner GmbH & Co. KG, Düsseldorf, Allemagne

Produits

Systems
Portes en bois 632 Pcs.
Steel plate doors 42 Pcs.
Rendering and plastering works
Gypsum plaster 7,500 sqm
Furniture
Built-in fixtures
Plasterboard partition systems
Metal stud plasterboard partition systems 15,000 sqm
Plasterboard ceiling systems
Perforated plasterboard ceilings 1,050 sqm
Plasterboard ceilings 2,150 sqm
F0 plafonds métalliques
LMD-St - Plafonds métal déployé 310 sqm
LMD-L LAOLA 1,450 sqm
LMD-E - Plafonds accrochés / de couloir 6,000 sqm
F30 Plafonds coupe-feu
F30-A/AB - Rabattable 1,000 sqm
Cloisons vitrées
Lindner Life cloisons vitrées 1,000 sqm
Portes
Portes pour systèmes muraux – Lindner Plus 72 Pcs.
Plafonds métalliques chauffants et rafraîchissants
Plafotherm® B – Plafonds sur profils porteurs 3,400 sqm
Plafotherm® E – Plafonds accrochés/de circulation 11,500 sqm
Plafotherm® L - Baffle Ceilings 800 sqm
Plafonds chauffants/rafraîchissants en placoplâtre
Plafotherm® GK HEDKA – Plafond en placoplâtre 1,000 sqm
Système de certification
DGNB

Téléchargements