New Elbe Tunnel 1, 2 and 3





Général
Projet: | New Elbe Tunnel 1, 2 and 3 |
---|---|
Forme du bâtiment: | Tunnel |
Adresse: | |
Code postal/Ville: | 20355 Hamburg |
Pays: | Allemagne |
Company Division: | Lindner Isoliertechnik & Industrieservice GmbH |
Achèvement: | from 2003 to 2011 |
Description
Projet: | New Elbe Tunnel 1, 2 and 3 |
---|---|
Description: | Due to abrasion to, and weathering of, asbestos components, the risk of asbestos dust was increased. Renovation measures were therefore put in place. As a certified specialist to TRGS 519, we removed the sprayed asbestos from the tubbing segments and replaced the fire protection materials. So as not to disrupt the motorway traffic for too long, we carried out all services in multiple shifts. |
Entreprises impliquées
Client: | Freie Hansestadt Hamburg, Hamburg, Allemagne |
---|
Produits
Clearance of harmful substances | ||
Sprayed asbestos | ||
Asbestos | ||
Fire regulation |