Projet: Axel-Springer-New Construction
Forme du bâtiment: Immeuble de bureau
Adresse: Zimmerstraße 50
Code postal/Ville: 10117 Berlin
Pays: Allemagne
Company Division: Lindner SE | Aménagement Central.Est Allemagne, Lindner SE | Chauffage et Refroidissement, Lindner SE | Planchers
Achèvement: from 2018 to 2020

Description

Projet: Axel-Springer-New Construction
Description:

With the new Axel Springer building, directly adjacent to the "golden" publishing building, the media and technology company is not only expanding its location in the heart of Berlin, but is also making an architectural statement here in relation to a new corporate culture. The futuristic-looking building, designed by Rem Koolhaas and his office OMA Rotterdam, embodies Axel Springer's transformation into a digital media house and offers the best conditions for new, interactive working methods. One of the highlights is the terraced, 45-meter-high atrium, with partly public areas and gastronomy, work and meeting points and generous visual contacts to Berlin's public life. With flexible office and cooperation areas, the building offers space for approximately 3,500 employees, distributed over a total of 11 upper floors, including newsrooms, TV studios and a green roof area for working together and taking breaks under the open sky. 

Lindner floor and ceiling systems, among others, were used for a well-functioning spatial implementation of the new working environments. For example, it was decided to use different versions of the NORTEC raised floor system or the hollow floor FLOOR and more® in order to conceal miles of IT lines, fire barriers etc. in the floor over a large area. The expanded metal ceiling systems also functionally complement the room concept: integrated heating and cooling elements ensure efficient and constant temperature control, and the central suspensions also include luminaires, sprinklers and presence detectors. In addition, Lindner also implemented many of the individual design requirements, such as gold-coloured metal cladding in the access areas of the lifts, which create a visual reference to the adjacent Axel Springer high-rise building with its gold-coloured facade. Dry construction elements, other wall and ceiling panelling as well as doors were also adapted to the high-quality material and colour concept in the new Axel Springer building and in part individually manufactured by Lindner. 

 

Entreprises impliquées

Architecture: Office for Metropolitan Architecture, Rotterdam, Allemagne
Client: Axel Springer SE, Berlin, Allemagne

Produits

F0 plafonds métalliques
LMD-St - Plafonds métal déployé 25,000
High performance chilled ceilings
Plafotherm® KN - convection ceilings
Faux-plancher
NORTEC 19,500
Planchers creux
FLOOR and more® comfort 800
FLOOR and more® comfort power 3,200
Plasterboard partition systems
Metal stud plasterboard partition systems 13,350
Plasterboard wall lining systems 4,300
Plasterboard ceiling systems
Plasterboard ceilings 2,500
Steel construction works
Systems
Habillage 5,000
Wallpaper doors 40 pce
Metal construction works
Painter, paperhanging and varnishing works
Insulation works
Wall insulation 1,800
Fire protection claddings