Projet: Covestro
Forme du bâtiment: Immeuble de bureau
Adresse: Friedrich-Ebert-Straße
Code postal/Ville: 51373 Leverkusen
Pays: Allemagne
Company Division: Lindner SE | Aménagement Intérieur et Ameublement, Lindner SE | Chauffage et Refroidissement, Lindner SE | Cloisons, Lindner SE | Planchers
Achèvement: from 2018 to 2021

Description

Projet: Covestro
Description:

Covestro AG moved into its new headquarters in the "chemical capital" of Leverkusen at the end of 2020 (with a reduced team due to the pandemic situation). The new administration building of the world's leading supplier of polymer materials, with six floors and modern office space, offers a lot of space and optimal working opportunities for up to 750 employees.

As the general contractor for the interior work, Lindner SE handled various trades from drywall construction to subcontractor services. The system walls, built-in furniture as well as counters, doors, ceiling and floor systems were produced in-house. In addition, Lindner Leuchtenfabrik (on behalf of the companies Kinzo and Signify) supplied design luminaires for work islands. Room-high, frameless full-glass walls allow natural light from the atrium into the inner areas. Lindner Life Freeze 137 glass partition wall systems create meeting rooms or "meeting boxes" as places of retreat in the otherwise open campus. Partly designed as curved glass wall elements, they underline the individual design claim and still meet the high static requirements.

On an area of more than 12,000 m², you will find above all the Lindner raised access floor NORTEC with sufficient installation space in the floor structure, a high level of walking comfort and for acoustic regulation. For heavy-duty areas, the FLOOR and more® power access floor was chosen, mostly covered with textile flooring.

Among other things, 5,400 m² of the Plafotherm® GK HEKDA® heating/cooling ceiling system ensure optimised acoustics and a good indoor climate in the open spaces. In cooperation with the architects HENN, a modern, light-open work campus was created within 20 months, in which employees can meet and cooperate more easily and efficiently.

Entreprises impliquées

Architecture: Henn Architekten, Munich, Allemagne

Produits

Plafonds chauffants/rafraîchissants en placoplâtre
Plafotherm® GK HEDKA® – Plafond en placoplâtre 5,400
Cloisons vitrées
Lindner Life Freeze 137 725 mètres
Lindner Life Pure 620 110 mètres
Portes à cadre tubulaire en aluminium
Furniture
Kitchenettes
Counters
Plasterboard partition systems
Metal stud plasterboard partition systems 6,000
Plastering works
Revêtements de sol
Textile 9,300
Planchers creux
FLOOR and more® power 5,145
Faux-plancher
NORTEC 9,300