EfW Boden

Général

Projet: EfW Boden
Forme du bâtiment: Centrale
Adresse: Degerbergsvägen 2
Code postal/Ville: 961 36 Boden
Pays: Suède
Company Division: Lindner Isoliertechnik & Industrieservice GmbH
Achèvement: 2018

Description

Projet: EfW Boden
Description:

Bodens Energi AB expanded its existing plant in Boden with a new waste-fired CHP line (P18) with a thermal capacity of 35 MW. The P18 line was integrated into the existing plant and housed in a new, separate building.
Lindner insulated the boiler, ducts and piping over an area of 5,900 square metres.

Entreprises impliquées

Client: Bodens Energie AB, Boden, Suède
Client´s Representative: Babcock & Wilcox Vølund A/S, Esbjerg,

Produits

Insulation of power stations
Insulation 5,900 sqm

Téléchargements