Waste Incineration Plant Dunbar

Général

Projet: Waste Incineration Plant Dunbar
Forme du bâtiment: Centrale
Adresse:
Code postal/Ville: EH42 1SW Dunbar
Pays: Royaume-Uni
Company Division: Lindner Isoliertechnik und Industrieservice GmbH | Branch Recklinghausen, Lindner SE | International Projects Contracting
Achèvement: from 2017 to 2018

Description

Projet: Waste Incineration Plant Dunbar
Description:

The waste-incineration power plant was built on a new site a few kilometers southeast of Dunbar in Scotland to replace the existing landfill site nearby. The waste-to-energy plant comprises two lines with a common building, a waste bunker and a turbine. Each boiler can burn 20 tons of waste per hour, producing 30 MW of electricity, enough to power 39,000 homes.
Boilers, ducts and pipelines were insulated with an insulation surface of 27,437 m². Insulation mats and insulation shells made of mineral wool were mainly used. The average number of insulators was 27, at peak times 57.

Entreprises impliquées

Client: Babcock & Wilcox Vølund A/S, Esbjerg,
Client: Viridor Enviroscot Limited, Edinburgh, Royaume-Uni

Produits

Insulation Works

Téléchargements