Hamad General Hospital Operating Theatre Expansion

General

Project: Hamad General Hospital Operating Theatre Expansion
Building Type: Hospital
Address:
Zip/City: 3050 Doha
Country: Qatar
Company Division: Lindner SE | Clean Rooms
Completion: from 2014 to 2015

Description

Project: Hamad General Hospital Operating Theatre Expansion
Description:

The population of Qatar has increased threefold in the course of the last ten years. As a consequence of this development, there have been massive changes in the healthcare system of the country. One of the most substantial government actions was the erection of the Hamad Medical City in the capital Doha, which was built with an investment volume of 2.4 bn Quatar-Riyal. This complex includes several hospitals with different specialties.

The recently finished surgery centre adds 20 operation theatres (among those two CT and one hybrid MRI) and 50 ICU´s (intensive care units) to the capacities of the adjacent Hamad General Hospital. Lindner Reinraumtechnik GmbH was commissioned with the complete interior fit-out of the building, including the planning of the CT and MRI areas, project planning, production, delivery and supervision of all installation works.

The modern and high-quality equipment of the building includes a radio-frequency cabin, Varicor shrub sinks and rooms for interventional imaging.

Companies involved

Client: Hamad Medical Corporation, Doha, Qatar

Products

Clean room ceilings
F30-A/AB - Swing-Down System 1,400 sqm
Clip clip-in ceilings 3,200 sqm
Equipment
Operation theater equipment
Medical engineering
Clean room light fixtures
Panel mounted light fixtures 650 Pcs.
Clean room doors
Sliding doors 65 Pcs.
Hinged doors 13 Pcs.
Clean room partitions
Glass partitions 2,520 sqm
Shell construction 19,000 sqm
F0 Metal ceiling
LMD-E - Hook-on/Corridor ceilings 620 sqm

Downloads