Bioethanol Production Plant

Lindner insulated the pipelines and containers with mineral rock wool and claddings.
img_be_bioethanolanlage_wanze_02
img_be_bioethanolanlage_wanze_08
img_be_bioethanolanlage_wanze_06
img_be_bioethanolanlage_wanze_07
img_be_bioethanolanlage_wanze_03

General

Project: Bioethanol Production Plant

Building Type: Power Plants

Address: 11, Rue Léon Charlier

Zip/City: 4520 Wanze

Country: Belgium

Completion: from 2008 to 2009

Company: Lindner Isoliertechnik &


Companies involved

Client: De Smet S.A. Engineers & Contractors

Architect: De Smet S.A. Engineers & Contractors


Products

Insulation Engineering


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.