Airport Frankfurt Terminal 3 Pier G

General Contracting Services in Airport Construction

With Terminal 3, Fraport AG is delivering one of the largest privately financed infrastructure projects in Europe at Frankfurt Airport. Covering a gross floor area of 403,000 m², the new terminal provides capacity for up to 19 million passengers per year. The first construction phase includes Piers G, H and J, the central check-in hall, the main terminal building and two new stations for the Sky Line railway.
Pier G is the first pier to be completed within Terminal 3. With a floor area of approximately 55,000 m², it comprises a head building with check-in areas, security screening and arrivals and departures zones. This is followed by a pier structure approximately 375 metres in length, accommodating boarding gates and passenger waiting areas.

General Contracting, Project Management and Integrated Planning

At Pier G, the Lindner Group demonstrated its expertise in comprehensive fit-out solutions. In addition, Lindner assumed 50 % of the joint venture (JV) scope and the role of general contractor. Alongside technical and commercial project management, this included planning and coordination as well as the supply and installation of all fit-out trades, in addition to façade, roofing and external works.
Given the scale of the project, the technical requirements and a short construction period of just 31 months, a closely coordinated project organisation was essential. By applying lean management methods and digital project control based on BIM, the fit-out works were delivered on schedule and to a high standard of quality.

Under the direction of the Interior Fit-Out Central-East division, several specialised units of the Lindner Group were involved in the project. These included Clean Room Technology and Object Design, the Heating and Cooling Technologies division, Lindner Montage + Service and LEX for construction materials and logistics. The scope of services was complemented by GiB mbH with fire protection engineering and building physics planning, as well as by Lindner Bautechnik GmbH as a subcontractor to the JV partner R+S.

System Solutions and Technical Fit-Out for Airport Operations

Pier G also incorporates numerous Lindner system products for floor and ceiling constructions manufactured in-house. To ensure execution quality, mock-up areas were established at an early stage, enabling fully fitted-out room scenarios to be assessed. The findings were incorporated directly into the ongoing planning process.

For the floor build-up in technical rooms, the FLOOR and more® dry hollow floor system was selected, enabling rapid installation and straightforward integration of technical infrastructure beneath the floor panels. In dry lining works, solutions such as the Click & Load installation grid and Lindner inspection doors with a fire resistance rating of I90 were installed.

A key technical feature of Pier G is the chilled ceiling system with Y-shaped baffles, developed specifically for this project. The suspended, hinged ceiling system integrates the building services installations and, in combination with Tektalan panels, allows access to individual elements for maintenance purposes. At the same time, the system meets stringent requirements in terms of cooling performance, acoustics and thermal insulation, while also complying with the specifications for seismic zone 1.
Lindner’s comprehensive scope of services additionally included site installation and logistics, industrial screed works, dry lining works with RC requirements, screed and tiling works, scaffolding, plasterboard works for ceilings, floors and walls, insulation and painting works, metal and joinery works, cleaning services, the installation of tea kitchens and the execution of external thermal insulation composite systems (ETICS).

As general contractor and full-service fit-out specialist, Lindner also delivered the connecting corridor between Pier G and the main terminal building.

Pier G at Frankfurt Airport Terminal 3 with Lindner Y-lamella heating and cooling ceiling, slanted glass façade and modern glass partitions in an open terminal area.
img_de_fraport_pier_g_19
Dark grey ceiling slats and pipes on an industrial-style ceiling
img_de_fraport_pier_g_23
img_de_fraport_pier_g_18

General

Project: Airport Frankfurt Terminal 3 Pier G

Building Type: Airports, Transportation Structures

Address: Frankfurt Airport

Zip/City: 60547 Frankfurt

Country: Germany

Completion: from 2019 to 2022

Company: Lindner SE | Fit-Out Central.East Germany, Lindner SE | Heated and Chilled Ceilings, Lindner SE | Luminaires, Lindner SE | Partitions, Lindner SE | Floors, Interior Fit-Out and Furnishings


Companies involved

Client: Fraport AG, Frankfurt


Products

General Contracting

Implementation planning

Building services insulation

Construction site equipment

Floor covering works

Floor coating works

Screed works

Tiling works

Scaffolding works

Plasterboard ceiling systems

Plasterboard partition systems

Insulation Engineering

Painting works

Metalworks

Plastering works

Cleaning works

Kitchenette

Carpentry

Composite thermal insulation system

Floors

Calcium Sulphate Panels

24000 sqm

Ceilings

Project-Related Solutions

1980 Pcs.

Doors

Wooden doors

Dry lining

Click & Load

Inspection Doors


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.