Favorites

Structural Engineering Scaffolding

Maßgeschneiderte temporäre Bauwerke und Sonderkonstruktionen

When standard scaffolding reaches its limits due to geometry, height or structural requirements, our focus shifts to cantilevered structures, intelligent load transfer concepts and the highest levels of structural precision.

In structural engineering scaffolding, we combine modular system components with bespoke steelwork and specialist technology. This allows us to create tailor-made temporary structures that adapt precisely to challenging spatial conditions – whether for safe load transfer or providing access to hard-to-reach building elements.

Our structural engineering scaffolding services

Cantilevered and suspended scaffolding
Bespoke cantilevered and suspended structures for challenging spatial conditions where no ground-level support points are available.

Tunnel and underground scaffolding
Adaptable mobile, working and support scaffolding for tunnelling, construction and refurbishment work in tunnels and civil engineering projects.

Tower and chimney scaffolding
Specialist solutions for extreme heights, including the integration of construction hoists, wind load calculations and bespoke anchoring concepts.

Specialist structures for silos and circular buildings
Geometrically precise internal and external scaffolding for industrial facilities, containers, boiler houses and power stations.

Bridge and infrastructure structures
Complex access, enclosure and support solutions for new construction, bearing replacement and refurbishment projects above live traffic or waterways.

Load distribution concepts for existing buildings
Bespoke support and substructures to transfer loads safely and in a controlled manner onto sensitive floors, ceilings and historic structures.

St Nicholas Church, Anklam

The refurbishment and conversion of St Nicholas' Church in Anklam is transforming the historic building into a modern museum and events venue as part of the IKAREUM – Lilienthal Flight Museum. For centuries, the listed church shaped the town's skyline with its former approximately 103-metre-high tower.

For the refurbishment and fit-out works, Lindner Gerüstbau GmbH provided bespoke scaffolding solutions. In addition to spatial and working scaffolds inside the church, specialist structures were installed for facade, tower and roof works, as well as for accessing hard-to-reach building elements. The scaffolding systems ensured safe working conditions and structural stability while taking into account the specific requirements of historic building conservation.

Applications of structural engineering scaffolding

Bridges and tunnels
Bridge lowering, refurbishment and tunnel or underground construction projects require scaffolding structures that perform reliably in confined spaces, under changing ground conditions and subject to stringent safety requirements.

Towers and chimneys
Very tall, slender structures require specialist solutions that take into account not only load-bearing capacity but also wind loads, accessibility and installation logistics at considerable heights.

Silos and circular buildings
Curved and cylindrical structures require scaffolding solutions that adapt precisely to the building geometry rather than relying on standard rectangular configurations.

Sensitive existing structures
For listed or structurally sensitive existing buildings, carefully designed load distribution concepts are essential to prevent localised overloading of the existing structure.

Gerüstbau

You can contact us anytime!

Our approach to structural engineering scaffolding

 

1. Structural design and feasibility assessment

Analysis of the building geometry, available connection points and permissible loads to establish the feasibility of a cantilevered or bespoke structural solution.

2. Detailed structural design

Development of the scaffolding design, including load assumptions, structural capacity and deflection calculations, as well as coordination with all project stakeholders.

3. Supervised installation

Erection of the structure in accordance with a defined installation sequence, accompanied by ongoing checks of critical connection and load-bearing points.

4. Monitoring, dismantling and documentation

Continuous monitoring throughout the period of use, followed by controlled and documented dismantling once the structure has been fully unloaded.

Frequently Asked Questions & Answers

References

Our Projects world wide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.