Falsework plays a vital load-bearing role wherever permanent structures are not yet in place or loads need to be temporarily supported and transferred. We design and install heavy-duty and specialist support structures for industrial, building and infrastructure projects.
Unlike conventional access and protective scaffolding, which primarily provides access to working areas, falsework is designed first and foremost to safely transfer loads. It creates a continuous load path from the supported structure down to the ground, keeping structures securely in position until they can support themselves.
Heavy-duty falsework
For the installation of machinery and equipment in industrial facilities, structurally designed to withstand high point loads and distributed loads.
Bridge lowering and refurbishment
Load-bearing structures that support bridge decks while bearings are replaced or structures are refurbished.
Load distribution concepts
For sensitive floors and existing buildings, ensuring that support forces are transferred safely and in a controlled manner into the ground.
Formwork support
For building and civil engineering projects, providing reliable support for floor slabs, beams and concrete elements.
Pipework and installation support beams
For maintenance and inspection work where plant components need to be temporarily supported.
Niederaußem Power Station is one of Germany's highest-capacity power stations and is home to the country's tallest industrial building. As part of extensive maintenance works in the boiler house, Lindner Gerüstbau GmbH provided the associated scaffolding services, using state-of-the-art planning software.
The main focus of the major overhaul was the installation of falsework to ensure safe load transfer during installation and inspection work on pipework and plant equipment. In addition, frame scaffolding and modular steel tube scaffolding were used as working, protective and suspended scaffolding. These precisely coordinated structures provided a safe working platform while meeting complex structural requirements.
At Zoologischer Garten railway station, a major transport hub in western Berlin, Lindner Gerüstbau GmbH delivered a technically demanding scaffolding and falsework structure. The main focus was the falsework, which placed high demands on planning, structural design and installation. The temporary support structure was individually designed to accommodate the existing building conditions and the required load transfer.
Restricted space and high pedestrian volumes required precise site logistics and the safe management of pedestrian and construction traffic. This created protected working and access areas, demonstrating the capabilities of specialist falsework solutions in challenging urban environments.
The Elstertal Viaduct is recognised as the world's second-largest brick-built railway bridge and is a significant historic monument subject to special conservation requirements. As part of the comprehensive refurbishment programme, which has been underway since 2022, Lindner Gerüstbau GmbH installed more than 2,100 tonnes of scaffolding material, including approximately 56,000 m³ of independent scaffolding, 17,000 m³ of suspended scaffolding, as well as facade scaffolding and combined facade and falsework structures.
Due to the uneven ground conditions and heritage conservation requirements, suspended scaffolding was used predominantly, incorporating specialist anchoring solutions with horizontal lattice girders and bespoke wall connection plates. Precise logistics planning ensured safe and timely project delivery despite challenging material deliveries and the tight deadlines set by Deutsche Bahn.
Thanks to their modular design, falsework structures can be adapted precisely to the height, span and shape required for each project. This makes them suitable for both horizontal and vertical structural elements, with typical applications including:
Depending on the project requirements, different structures are used, tailored to the span, type of load and structural configuration.
Gerüstbau
Definition of construction stages, load assumptions and limit values for load-bearing capacity and serviceability, taking into account construction sequencing, transport routes and crane access.
Preparation of the ground, positioning of load distribution plates and installation of props, beams and bracing in accordance with a defined installation sequence.
Ongoing monitoring of deflection, settlement and horizontal displacement using measurement points, including predefined intervention plans in the event of limit values being exceeded.
Gradual unloading and dismantling in stages from top to bottom, with documented approval of the structural conditions before each release.
Falsework creates a continuous load path from the supported structure down to the ground. Its load-bearing performance results from the interaction of standardised system components and project-specific supplementary structures. Key factors include geometry, bracing, connection points, foundations and coordination with the construction sequence.
Typical components include:
Shoring towers, adjustable props and support frames for vertical load transfer
Beams, frames, lattice girders and bridging beams for spanning distances
Bracing elements (diagonals and couplings) to prevent tipping and buckling
Head jacks, load distribution plates, foundations and sole plates
Bearing and connection details for existing structural elements, with defined load transfer
Sliding and shifting elements for lifting, lowering and moving operations
Safety components such as catch bearings and emergency supports for defined failure and emergency scenarios