Le Coeur Düsseldorf

New Construction Meets Existing Structure

In the heart of Düsseldorf, Le Coeur is taking shape – a high-end new development that combines modern office spaces on the upper floors with retail and gastronomy areas on the ground level. Covering a gross floor area of approximately 63,000 m², the project blends new construction and the refurbishment of existing structures. Around 50% of the original 1980s building fabric, including load-bearing structures, is being preserved. The development is designed in line with ecological and social sustainability criteria and aims for DGNB Platinum Certification for sustainable building performance.

Lindner is responsible for Complete Fit-Out

Lindner is entrusted with the complete interior fit-out, including drywall, screed, painting, and joinery works, as well as custom-made interior components from its own production facilities. The project features premium Lindner systems such as Lindner Metal Ceilings LMD-E 312, Lindner Glass Partitions Lindner Life Freeze 137 and Lindner Life Stereo 125, along with the flexible raised floor system CAVOPEX. In addition, Lindner installs steel and tubular frame doors as well as gate systems, and realises not only wall claddings but also high-quality mirror walls that add depth and elegance to the interior spaces.

Efficient Processes with Lean Construction Management

Through Lean Construction Management, Lindner streamlines installation workflows, systematically identifies inefficiencies, and ensures smooth processes, exceptional quality, and reliable scheduling.
The interior fit-out harmoniously combines functionality, material excellence, and architectural elegance. With Le Coeur, a modern, vibrant building emerges in which work, retail, and gastronomy coexist seamlessly — setting new standards for sustainable and high-quality urban architecture in Düsseldorf.

General

Project: Le Coeur Düsseldorf

Building Type: Multipurpose buildings, Office buildings, Gastronomy, Business premises

Address: Königsallee 37

Zip/City: 40213 Düsseldorf

Country: Germany

Completion: 2026

Company: Lindner SE | Fit-Out North.Northwest Germany


Products

General Contracting

Floor covering works

Floor coating works

Screed works

Tiling works

Plasterboard ceiling systems

Plasterboard partition systems

Painting works

Metalworks

Plastering works

Cleaning works

Locksmith works

Carpentry

Dry construction works

Sealing works

Ceilings

Corridor Ceilings

Floors

Nasshohlboden

CAVOPEX

Lean Construction Management


Architect

Pickard Chilton


Client

Hines Immobilien GmbH


Engineer

Diete + Siepmann Ingenieurgesellschaft mbH


Implementation Planning

RKW Architektur +


Rendering der Außenansicht des zukünftigen Le Coeur Düsseldorf – Neubaufassade am Straßeneck mit grünen Bäumen im Vordergrund. | © © Hines Immobilien GmbH
© © Hines Immobilien GmbH
© © Hines Immobilien GmbH

References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.