In the heart of Düsseldorf, Le Coeur is taking shape – a high-end new development that combines modern office spaces on the upper floors with retail and gastronomy areas on the ground level. Covering a gross floor area of approximately 63,000 m², the project blends new construction and the refurbishment of existing structures. Around 50% of the original 1980s building fabric, including load-bearing structures, is being preserved. The development is designed in line with ecological and social sustainability criteria and aims for DGNB Platinum Certification for sustainable building performance.
Lindner is entrusted with the complete interior fit-out, including drywall, screed, painting, and joinery works, as well as custom-made interior components from its own production facilities. The project features premium Lindner systems such as Lindner Metal Ceilings LMD-E 312, Lindner Glass Partitions Lindner Life Freeze 137 and Lindner Life Stereo 125, along with the flexible raised floor system CAVOPEX. In addition, Lindner installs steel and tubular frame doors as well as gate systems, and realises not only wall claddings but also high-quality mirror walls that add depth and elegance to the interior spaces.
Through Lean Construction Management, Lindner streamlines installation workflows, systematically identifies inefficiencies, and ensures smooth processes, exceptional quality, and reliable scheduling.
The interior fit-out harmoniously combines functionality, material excellence, and architectural elegance. With Le Coeur, a modern, vibrant building emerges in which work, retail, and gastronomy coexist seamlessly — setting new standards for sustainable and high-quality urban architecture in Düsseldorf.
Project: Le Coeur Düsseldorf
Building Type: Multipurpose buildings, Office buildings, Gastronomy, Business premises
Address: Königsallee 37
Zip/City: 40213 Düsseldorf
Country: Germany
Completion: 2026
Company: Lindner SE | Fit-Out North.Northwest Germany
General Contracting
Floor covering works
Floor coating works
Screed works
Tiling works
Plasterboard ceiling systems
Plasterboard partition systems
Painting works
Metalworks
Plastering works
Cleaning works
Locksmith works
Carpentry
Dry construction works
Sealing works
Partitions
Floors
Nasshohlboden
CAVOPEX
Lean Construction Management
Pickard Chilton
Hines Immobilien GmbH
Diete + Siepmann Ingenieurgesellschaft mbH
RKW Architektur +



