Lindner insulated the entire blast furnace gas power plant with a surface of 29,000 square metres. Our insulation works included the heat and sound insulation of flue gas-, hot air-, BFG-channels, boiler, boiler porches, as well as all tubes and components with wire netting mats and galvanized sheet metal plates.
Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.