DATEV

The IT service provider and software developer DATEV eG extended its capacities with the new office building "IT-Campus 111". The building features 1,800 workplaces and 150 places of retreat, together with modern conference and meeting rooms. The architecture and equipment of the office areas support both internal communication and concentrated working all the while creating ideal overall conditions for work routines in modern software development.

Lindner´s performances play a crucial role in the interior design concept. In order to create the aforementioned spaces for concentrated working and meetings, Lindner partition systems and doors were installed. Designed as the room-in-room system Lindner Cube, these partitions excel at creating a pleasant room atmosphere in open-plan offices. This effect is enhanced by Lindner canopy ceilings with integrated heating and colling technology, installed in meeting rooms.

General

Project: DATEV

Building Type: Office buildings

Address: Fürther Straße 111

Zip/City: 90429 Nürnberg

Country: Germany

Completion: from 2014 to 2015

Company: Lindner SE | Heating and Cooling, Lindner SE | Partitions


Companies involved

Client: DATEV eG

Architect: Boesel Benkert Hohberg Architekten


Products

Ceilings

Heated and Chilled Canopy Ceilings

Partitions

Partition Systems Glass

Doors for Partition Systems

Partition Systems Full Panel

Room-in-Room


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.