Hapag-Lloyd Rosenstraße 17

With the aim of adapting the Hapag-Lloyd office building in Rosenstrasse 17 to modern requirements, the building was extensively modernised and expanded. With the comprehensive revitalisation, the building was not only made energy-efficient, but also received a "new look" towards a pleasant and contemporary working environment thanks to modular room structures and state-of-the-art technology. The architects and builders placed particular emphasis on improving floor flexibility and high room comfort.

The Lindner Group, with the tenant fit-out division Design & Build, played a central role in the renovation of the office spaces and provided a variety of products and services.

The installation of Lindner heated and chilled ceilings enables efficient temperature regulation and contributes to reducing energy costs. The connection and supply of the heating/cooling elements are done via floor piping. During installation, the assembly teams ensured a clean, uniform appearance of the pipes between the ceiling panels. Various light channels and light figures, some in wavy and round designs from the in-house lighting factory, provide effective lighting that is both functional and aesthetically pleasing.

For the partition wall systems, Lindner Life Freeze 137 glass walls were chosen to emphasise the aesthetic design of the building. Thanks to flush bonding, the rooms appear more open and harmonious, while the unique Structural Glazing technology guarantees a durable and high-quality solution without edge printing. In addition, the sound-absorbing partition walls Lindner Logic 100 Metal-Acoustic were installed, which visually improve privacy in the work areas and ensure a quiet working environment. Matching door systems seamlessly fit into the overall image.

Various other services such as demolition and site setup, technical building equipment, and fire protection measures as well as electrical, painting, and drywall works etc. complete the overall package of the Lindner Group.

Lindner was an important partner from the beginning and also took over the execution planning. The tenant fit-out was carried out in an open-book procedure and partly during ongoing operations. This approach enabled a flexible and transparent project execution and on-time completion.

General

Project: Hapag-Lloyd Rosenstraße 17

Building Type: Office Buildings, Facilities for Meetings, Conventions and Conferences, Industrial and commercial construction

Address: Rosenstraße 17

Zip/City: 20095 Hamburg

Country: Germany

Completion: from 2022 to 2024

Company: Lindner SE | Fit-Out North.Northwest Germany, Lindner SE | Ceilings, Lindner SE | Luminaires, Lindner SE | Partitions


Companies involved

Client: Hapag-Lloyd AG

Partner: AIS Projektmanagement GmbH


Products

Tenant fit-out

Demolition works

Implementation planning

Building services insulation

Construction site equipment

Floor covering works

Tiling works

Scaffolding works

Plasterboard ceiling systems

Plasterboard partition systems

Painting works

Metalworks

Plastering works

Cleaning works

Shell construction works

Dismantling works

Sanitary work

Locksmith works

Kitchenette

Carpentry

Dry construction works

Electrical engineering

Measurement, control and regulation technology

Fire detection technology

Air conditioning systems

Luminaires

Suspended luminaires

Light channels

Ceilings

Heated and Chilled Canopy Ceilings

Partitions

Partition Systems Glass

Partition Systems Full Panel


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.