Tenant Fit-Out "Haus der kleinen Leute"

With the opening of the “Lila Haus” in Düsseldorf’s Flingern-Nord district, another location of the family-run “Haus der kleinen Leute” has been successfully realised. This large-scale day care centre follows a bespoke childcare concept that places independence, a sense of orientation, and emotional security at its heart. Situated on spacious, barrier-free ground floor premises, the facility unites all aspects of daily life – playing, learning, eating, and sleeping – within a harmoniously coordinated spatial layout.

As part of a colour-coded building ensemble within the Living Circle residential quarter, the new “Lila Haus” sets distinctive visual accents. Direct access to Hanielpark offers nature-based experiences despite its central urban location. The room design in soft lavender tones, coordinated furnishings and expansive windows create an open, welcoming atmosphere that offers children space to explore and grow.

High-Performance Interior Fit-Out for a Modern Childcare Facility

The interior fit-out of the “Lila Haus” was carried out by the Lindner Group, with the aim of creating an environment that is both functional and durable, while also tailored to the specific needs of early childhood care.

The works included all interior trades: from drywall construction and screed flooring to high-quality floor finishes, tiling, fire protection works and painting. Particular attention was paid to acoustic insulation – a crucial factor in an environment where children need to play, concentrate, and rest without disturbance. Acoustic optimisation was achieved through targeted construction measures, especially across ceilings and wall surfaces.

The facility was also fitted out with state-of-the-art technical systems. The building services engineering (TGA) was designed and implemented to be efficient, sustainable, and low-maintenance. In addition to meeting the operational requirements of a childcare centre, the systems also contribute to the building’s overall energy performance through their resource-efficient design. Our services included all electrical work as well as the complete heating, air conditioning and sanitary technology.

Challenging Planning and Execution

One of the main challenges lay in the tight project timeline, necessitated by a fixed move-in date. As a result, the coordination and delivery of all trades had to be carried out under significant time pressure. Despite this, all work was completed on schedule and to a high standard – including additional tasks and short-notice adjustments that arose during the construction process, all of which were seamlessly integrated.

© © www.Lindner-Group.com
© © www.Lindner-Group.com
© © www.Lindner-Group.com
© © www.Lindner-Group.com

General

Project: Tenant Fit-Out "Haus der kleinen Leute"

Building Type: Daycare centers and kindergartens

Address: Grafenberger Allee 250

Zip/City: 40235 Düsseldorf

Country: Germany

Completion: 2024

Company: Lindner SE | Fit-Out North.Northwest Germany


Companies involved

Architect: Kaspar Kraemer Architekten GmbH

Client: ImmoSubstanz Sohn GmbH & Co. KG

Tenant: Haus der kleinen Leute GmbH


Products

Tenant fit-out

Construction site equipment

Floor covering works

Electrical works

Screed works

Tiling works

Plasterboard ceiling systems

Plasterboard partition systems

Painting works

Cleaning works

Dry construction works

Building services insulation

Building services engineering

Heating system

Air conditioning systems

Sanitary systems

Electrical engineering

Doors

Wooden doors


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.