Trivago Headquarters

General

Project: Trivago Headquarters
Building Type: Office buildings
Address: Kesselstraße 5 - 7
Zip/City: 40221 Düsseldorf
Country: Germany
Company Division: Lindner SE | Fit-Out North.Northwest Germany, Lindner SE | Heating and Cooling
Completion: 2018

Description

Project: Trivago Headquarters
Description:

The new headquarters of the hotel search portal Trivago was built in the Düsseldorf Media Harbor. The building complex, which consists of a plinth building and a tower, is a prominent point in its surroundings with its organic architecture. The campus offers about 2,000 employees high quality work areas and the large number of recreational areas. The sustainable building concept of the 54,000 m² GFA campus aims to achieve LEED Gold certification.

Lindner contributed to the interior fit-out of the plinth building at Trivago Headquarters with metal heated and chilled ceilings, metal ceilings, drywall and wooden doors. A particular challenge was to adapt the installed systems to the sophisticated building geometry. Due to the organic form, especially in the area of ceiling systems, there was a very high demand for individualization. Approx. 21,500 m² of Lindner metal ceilings were installed, with nearly every ceiling panel being unique. In order to handle the considerable planning effort, the detailed drawings were created automatically with fixed parameters according to a specially programmed CAD solution. This ensured reliable planning of the ceiling systems. Thanks to perforation and rear heating / cooling technology, the ceilings in the building not only provide a sophisticated look, but also provide functional aspects such as acoustic regulation of the premises and energy-efficient temperature control, which contributes to the desired LEED Gold certification.

Companies involved

Architecture: slapa oberholz pszczulny architekten, 40474 Düsseldorf, Germany
Client: IMMOFINANZ Deutschland GmbH, Cologne, Germany
General Contractor: Ed. Züblin AG, Stuttgart, Germany

Products

Certification system
LEED
Heated and chilled metal ceilings
Plafotherm® B - Post Cap ceilings 19,400 sqm
Plafotherm® E - Hook-On/Corridor ceilings 2,100 sqm
F0 Metal ceiling
LMD-E - Hook-on/Corridor ceilings 4,000 sqm
Door and gate systems
Fire protection doors 22 Pcs.
Wooden Doors 494 Pcs.
Plasterboard partition systems
Metal stud plasterboard partition systems 17,000 sqm
Plasterboard wall lining systems 4,300 sqm
Plasterboard ceiling systems
Plasterboard ceilings 1,250 sqm