Fresenius Kabi Melrose Park Expansion

Since its entry in the U.S. market in 2008, the healthcare company Fresenius Kabi has grown to become a leading provider of generic injectable drugs. Therefor the company’s Melrose Park pharmaceutical manufacturing campus is being expanded into one of the largest and most advanced sterile injectable drug production facilities in the world. As part of this expansion, the site was expanded by 12,000 m² of clean rooms according to plans by the CRB Group. The new campus also provides space for a conference centre, offices and a cafeteria for approximately 700 employees. At the end of the construction period, further cleanrooms were built in the same building according to plans by Genesis Architects from Philadelphia, also all equipped with Lindner cleanroom systems.                                                   

Lindner Clean Rooms was responsible for the fit-out of the cleanrooms in classes C, D and CNC, including intensive planning services. The Lindner team worked closely with the planners from the CRB Group and the Fresenius Kabi engineering and project team. Together, they designed suitable solutions with partly new product developments. The coordination of the construction site was handled by the Gilbane Building Company as Main Contractor. The high quality assembly of the cleanroom systems was also executed by the local assembly specialist Thorne and an experienced Lindner Supervisor Team. Specific works such as sealing and door commissioning were carried out by Lindner in cooperation with local partners such as Dormakaba USA.

img_us_fresenius_1
img_us_fresenius_8
img_us_fresenius_40
img_us_fresenius_21

General

Project: Fresenius Kabi Melrose Park Expansion

Building Type: Laboratories and Research Facilities

Address: 2030 North Ruby Street

Zip/City: 60160 Illinois

Country: United States

Completion: from 2017 to 2020

Company: Lindner SE | Clean Rooms


Companies involved

Client: Fresenius Kabi USA, LLC

Architect: CRB Group

Architect: Genesis Architects


Products

Clean Room

Steel grid systems

12000 sqm

Partition systems glass

1000 sqm

Hinged doors

120 Pcs.

Sliding doors

70 Pcs.

Return air

Supply air

Clean Room Lighting


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.