Renovation of Philippus Church

The Philippus Chrurch, which was almost in its original state since 1910, is one of the landmark buildings in the west of the city of Leipzig. Its striking elements are, above all, the almost 62-meter-high tower and the numerous neo-Baroque ornaments. Since 2012, the Philippus Church belongs to the Vocational Training Center Leipzig.

In the course of renovation work, Lindner GFT realized the underfloor heating in the nave and the altar area with the NORIT-underfloor heating NORIT-TE 30 Therm GF (gypsum fiber), which combines dry screed and underfloor heating. With a low construction height of only 33 mm, the system was the convincing solution for this refurbishment. After the NORIT-potting compound has been applied, the system can already be walked on after 4 hours and is ready for floor covering after 24 hours, which has positive effects on the construction period.

img_de_philippus_102

General

Project: Renovation of Philippus Church

Building Type: Refurbishment

Address: Aurelienstraße 54

Zip/City: 04177 Leipzig

Country: Germany

Completion: 2019

Company: Lindner Gipsfaser- und Trockenbau


Products

Dry lining


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.